Last we shared the newly fabricated banquette for the Brookline project. Check out some progress on the job site. A majority of the first floor was flagstone and some tumbled slate tiles in the kitchen – not the clients cup of tea. So since we had the timeline this summer they decided to pull it all out and replace it with wood and while at it add radiant heat. Next week we should have the banquette on site and the cushions should be done in a few weeks – can’t wait. Props to Stacey as getting our set of drawings for this out the door quickly; we had a tight timeline and she worked out the CAD drawings and some sketchup studies to make this design come together; I don’t know what I would do without her!

Kristina Crestin Design_X Brookline banquette progress B JPGGC:  The Holland Companies

KC signature